Every unit requires an annual inspection conducted by the Zortrax Authorized Service to keep the ATEX certification valid and ensure safe operation of the device. |
1
Front View (Closed)
- Touchscreen
- Filler Cover
- Solvent Level Indicator
- Chamber Door
- Chamber Door Handle
2
Front View (Open)
- Solvent Tray
- Drain Tube
- Stirrer Cover
- Air Outlet Opening
- Filler Cap
- Platform
3
Right-side View
- Carrying Handle
- Air Inlet Opening
- Stirrer Fuse
- Switch; Main Fuse; Power Connector
- Ethernet Port
- USB Port